[1]
“Analysis of the water potential of the Jaramillo River in the natural reserve of the Llanganates National Park to size a generation system that supplies the demand for electrical energy of the Premos Jaramillo association”, CIYA, vol. 4, no. 2, pp. 16–29, Sep. 2021, Accessed: Jun. 04, 2026. [Online]. Available: https://investigacion.utc.edu.ec/index.php/ciya/article/view/355